So I was over at the church today working with Jean Gomis to modify the plan for tiling the bathroom and shower stalls. It already looks so much nicer with the tile in the one bathing area and the new Turkish toilet. I'm causing a bit of a delay for finishing the tile in order to run a drain line to the French drain. But all should be done in a couple days.
Though it was a fairly quiet day, so not real representative of the controlled chaos Jane often deals with, I thought you'd like to see her in action.